Since 1979, Crimson Hockey has called Alexander Bright Arena their home. The ice and air quality are crucial for the teams, visitors, and fans. To enable year-round use, TG Gallagher designed and installed a dehumidification system using a design-build approach. To ensure that summer programs began on time, TG Gallagher worked closely with the owner, architect, and general contractor to meet the aggressive design and construction schedule.
Architect: ARC
Engineer: TG Gallagher (Design Build)
General Contractor: Lee Kennedy Co.